Archives: Layihələr

INDUSTRIAL FACILITIES

Construction of pressurized sewer pipelines from the chamber equipped with pump equipment on the existing collector to the connection point of the centralized drainage system. Execution of construction, installation, and commissioning works (including material supply) within the framework of the project for the construction of the 220 kV "Kolyma HPP – Ust-Srednekanskaya HPP" overhead transmission […]
Read More

INFRASTRUCTURE FACILITIES

Concrete lining of irrigation canal and repair of water utility structure Construction of Gulaband irrigation canal in Ujar district with concrete lining and repair of structures on it Repair and construction of water utility and related installations in Yeniarkh, Goychay district Capital repairs of water utility L with concrete lining in Azadkend village of Saatli […]
Read More