Construction of pressurized sewer pipelines from the chamber equipped with pump equipment on the existing collector to the connection point of the centralized drainage system.
Execution of construction, installation, and commissioning works (including material supply) within the framework of the project for the construction of the 220 kV "Kolyma HPP – Ust-Srednekanskaya HPP" overhead transmission line.